NTI boiler installed plumbing all done. Gas hookup next week. Venting to do yet. Roof going on next week. I’ll finish the electrical upstairs and electrical inspection next week too. Lots to do. Sleepless nights!
5224D2C2-A2F3-45B6-B608-7A335B827049.jpeg
127A2B95-CC8D-4BC2-BC7A-1E02B60DD68D.jpeg
C9A9DD9E-AA29-4A0D-B211-0BDFC180F6D4.jpeg
C638DFA6-60F1-44D9-8B02-8B69072F0B71.jpeg
5D0939AC-6BD8-42B5-8C6A-36815B948570.jpeg
 
Roof started going on. End walls built and main support beam went in at the end of the day.
electrical roughin passed.
All insulating and vapour barrier done on main floor.
propane tank delivered and hooked.
Modulating high efficient boiler installed just need to do the venting and gas supply lines.
The upstairs. Yep that’s my man cave.
14938631-6741-46B6-8A7F-0A314F3B9549.jpeg
F1859540-22DC-434F-B7D5-7164AE3CD890.jpeg
7AC97EFD-635C-48F2-89FD-5959EFB1C300.jpeg
75282AA4-9517-4647-8E96-7CC32AEDDA46.jpeg
1B6CF2E7-33B8-4102-96DA-695F800295CA.jpeg
B134F1C4-0373-4D35-8B68-7CDDBC782C35.jpeg
486EAC49-817A-4689-B178-04110A84FA08.jpeg
18E3CE29-A45A-4F42-BE7D-5577A1801861.jpeg
13043D15-7D9E-4968-A6E2-2090DDFE034E.jpeg
79FB0227-4D52-4608-8AD1-CB6AB99ED311.jpeg
 
It’s going to be a very nice addition to that beautiful piece of property you have that’s for sure.
 
When is the elevator being installed ?

Very nice build!!! I worked in only 1 shop that had infloor heat, it was absolutely awesome.
 
Dormers are getting framed up and rafters going on.
but... apparently the week after New Years is a Chinese holiday called dragginass so progress is slow.
DE381D20-6334-4E51-97D9-47EFF4ECC4DB.jpeg
 
Sheeting is going on. I’ll be wiring this weekend. Insulation and vapour barier next week then doors and windows go in. Then heat goes on.
C8FF84F7-D90D-4EAA-AEF9-CEF51F1DF582.jpeg
124C0C31-B1AE-4FC7-B43E-A0D56F1665FE.jpeg
72C68EDA-83F3-4C73-BB27-02F5A1EA2C40.jpeg
A5E12F37-A811-479A-A2F5-F8664DF4B6C5.jpeg
 
Insulation
vapor barier
Electrical inspected and passed
Shingles mostly done.
5AD46467-7D83-4A38-910C-0E146B284C70.jpeg
AD041DAF-F4C3-4156-838F-CDAA65987DA1.jpeg
E533B7C7-7997-4773-8DB9-961BA3CF22AF.jpeg
2BBF1CA3-5B7E-4FE5-B4C2-35D024399E53.jpeg
8DD61F79-59ED-4819-A20B-146BC7A9A730.jpeg

Doors are ready for pickup. Green of course.
 

Attachments

  • 06BF051A-7734-473B-AD1E-649A9CBA5C33.jpeg
    06BF051A-7734-473B-AD1E-649A9CBA5C33.jpeg
    431.9 KB · Views: 49
  • 019BF68A-91FF-4E22-9ED2-46FA6A8FF8D9.jpeg
    019BF68A-91FF-4E22-9ED2-46FA6A8FF8D9.jpeg
    360.8 KB · Views: 52
  • FBC148A2-5EC3-4302-A901-74E5ADDCC384.jpeg
    FBC148A2-5EC3-4302-A901-74E5ADDCC384.jpeg
    311 KB · Views: 44
Last edited:
Insulating 80% done. Then the vapor barier. Garage doors painted green and going in this morning. Fired up the furnace yesterday. Heat is ready to go. Tried to fire the boiler but it wouldn’t go. Glycol too viscous. It’ll go once the garage is warmed up some.
AB80FF81-2A20-44D3-B6F4-8354A97CC881.jpeg
3D410310-1EC7-4407-B1DF-1E7D05321F0C.jpeg
FA99A6F0-B16C-444F-8F45-00F386FE3AD5.jpeg
423A4BE1-E1B5-4543-A585-592BEA40437D.png


3C92936C-37E5-4093-B06F-D60B98DD267D.jpeg


FBB13C3B-0A77-4B56-A286-577C60B03E1D.jpeg


192D6463-6A1B-4CC9-98FC-E7C3457D1833.jpeg
 
Last edited:
Old Thread: Hello . There have been no replies in this thread for 90 days.
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.
Back
Top