Parts are rolling in. I expect it to be at least a month before I make my first run. Trying to get 100-110mph is going to be some work. I still need to tear the chassis and components down and check everything out. Rebuild it within the specs I need. Making choices for my gears took me the longest. Finally have several on the way to experiment with. Expect to have 50 hours in it before I hit the throttle. Wish me luck
Oh and built connectors! What are some good gold plated, non cheap metal connectors. I don’t want to fry my set up one a $1
Oh and built connectors! What are some good gold plated, non cheap metal connectors. I don’t want to fry my set up one a $1