Droste78
Active Member
I used pressure treated 2x4s for all the structure on mine with a hdpe top (thanks johndilly and whoever recommended it to him!) Held together with a single bolt and tnut at each junction. In theory, should tear down and set up inside 20 minutes and store mostly flat. No plans though, just built as I went....
Last edited: